WORK INSPECTION - PAINTING
Painting work
Internal Painting
1 All edges and corners in rooms and around windows are sharp and are in right Angle.2 Beams / windows projection are equal and are in level.
3 Visible cracks are properly filled.
4 No undulation is seen in ceiling and walls.
5 Painting material is of approved quality and of approved make.
6 No shade difference or brush lining is visible after final coat of painting.
7 No Paint mark on other fittings
8 Area is cleaned properly after painting.
External Painting
1 Approved Quality of painting material is used.2 Curing is done at least for 3 days after 1st coat of painting.( Cement Paint )
3 Repairing if required should be done before final coat of painting.
4 Window jams are properly cleaned before removing scaffolding.
5 No shade difference visible after final coat of painting.
6 External painting area is shown to Project Engineer before Removal of scaffolding.