WORK INSPECTION - ELECTRICAL WORK
Electrical Work
1 Grooves in brick masonry are cut by cutting machine.
2 Location of electrical boxes are as per plan.
3 Pipes/ Accessories/boxes are of approved quality.
4 Wires and switches used for electrical work is of approved quality.
5 Conduits are concealed by plastering(with fiber) in level of brickwork, that plaster is roughened & cured using curing compound
6 Wires and cable used is of appropriate size.
7 Line & Level of concealed boxes are ok.
8 Fan hooks provided in rooms are at correct location.
9 Separate circuit is provided for different power points.
10 Earthing is provided in 5 Amp plug & 15 Amp power plug points.
11 ELCB & MCB fixed in DB is of proper rating/capacity.
12 Earthing pit provided for bldg. is of proper specification.
13 Light & power supply in lift shaft & in machine room is as per lift requirement.